The Company

How we score. How we work.

HyphenHW finds the parts that could stall a hardware build while your team can still act, then sources and quotes them.

The method

Six dimensions, scored the same way every time.

The risk engine scores every line from live authorized-distributor data, our entries and the part’s category, and shows which source each score came from. An engineer reviews it, because a risk without a remedy is just a complaint.

01

Lead time vs. build date

Measured against your actual schedule with margin, not against a catalogue number.

02

Sourcing concentration

Single source, single fab, single region. Where the chain narrows to one point of failure.

03

Lifecycle status

Active, not recommended for new designs, or end of life. Free to avoid, expensive to fix.

04

Inventory depth

Stock across authorized distribution relative to what you need, at your volume.

05

Allocation history

Whether this family has gone on allocation before, and what happened to small buyers when it did.

06

Substitution difficulty

Drop-in, footprint-compatible, or requires a respin. This decides whether a flag is urgent.

How it works

One BoM in. A plan back.

01 · INTAKE

You send one BoM

A spreadsheet with manufacturer part numbers, your build volume and your target date. That’s the whole ask.

02 · NORMALISE

We validate every line

House numbers, obsolete numbering and lines with no sourceable part behind them surface immediately.

03 · SCORE

Six dimensions, every part

Scored from authorized-distributor data. An engineer reviews every flag before you see it.

04 · REMEDY

Alternates, not just warnings

Flagged lines come back with candidate alternates where they are technically and commercially feasible, and the change each would need. Your engineers decide.

Lead times change week to week, and every alternate needs your engineering review before it goes on the board. See a sample report →

Services

Four ways in.

Send us your BoM under a mutual NDA. We show you where the risk is and agree the scope and dates before any work begins.

Behind every engagement, we watch what can push your timeline back: parts, shipping lanes, weather, and the systems your suppliers run on.

01 / ASSESSMENT

BoM risk assessment

Every line scored on six dimensions and reviewed by an engineer, with candidate alternates for high-risk parts where a practical one exists. The standard assessment covers up to 150 manufacturer part numbers, with the report within five business days of a complete intake. Larger BoMs are quoted separately, with their own date.

Fixed scope · quoted before work starts
02 / SOURCING

Sourcing and quoting

We request quotes from your approved suppliers and qualified alternates, and compare price at your quantity, MOQ, lead time, landed cost and spec side by side. Your team places the PO. Start with a two-week pilot on your 5–10 hardest parts.

Pilot, then monthly · agreed in writing first
03 / BUILD

Fab and SMT build coordination

We coordinate your bare-board fabrication and SMT assembly with the fab house and the contract manufacturer: build packages, quotes, kitting status and the schedule, through to boards in hand. Your team approves the suppliers and places the orders.

Per build · quoted before work starts
04 / COVERAGE

Fractional NPI

A program manager for the build cycle without the headcount. Weekly engineering cadence, written status every Friday, allocation managed through EVT to PVT.

Monthly engagement · sized to your program
Why us

Everyone else gets paid after it goes wrong.

Your distributors and contract manufacturer are partners in the build, and we work alongside them. The open-market broker is different: their margin grows with your shortage.

THE OPEN MARKET

Paid at the moment you fail

The broker’s margin is created by your shortage. The worse it gets, the more they make, and provenance is harder to prove, which raises counterfeit exposure.

HYPHENHW

Paid to make sure you don’t

Earned by catching the risk while your team can still act on it. Authorized distribution only. We never take title, so we never profit from scarcity.

How we work

You stay in control of the parts, the money and the design.

Your team places every order

We quote and recommend; your procurement team places the PO directly with the supplier. We never commit or order on your behalf.

Authorized sources only

Quotes come from authorized distributors or the manufacturer. HyphenHW never resells parts, holds inventory or takes title.

Your engineers own the design

We bring candidate alternates and the change each would need. Your EEs decide what goes on the board.

Distributors and CMs are partners

We work with your distributor reps and contract manufacturer on one shared schedule, not around them.

Confidential from the start

A mutual NDA comes before your BoM does. Export-controlled (ITAR/EAR) data stays out of scope.

In writing, every week

A short status report: risks, orders, dates and the decisions we need from you. See a sample →

Where this came from

It didn’t come from market research. It came from watching program managers hoard constrained parts and trade them between builds, because no system existed to do it properly.

ASM Hasan — Founder

Years running new-product-introduction programs for consumer wearables: manufacturing DRI across PCBA fabrication, assembly and validation builds, owning sourcing and allocation for exactly the constrained categories this business exists to handle. Electrical engineering background, so the conversation with your EEs about second-sourcing is technical, not clerical.

Who this is for

Anyone building real hardware, at any size.

Any size, any stage

From a two-person team’s first prototype to programs at the largest hardware companies, at EVT, DVT, PVT or in production.

Sensor-heavy devices

Wearables, robotics, medical and industrial: wherever IMUs, AFEs and power ICs dominate the BoM.

With or without procurement

No supply-chain function yet, or a busy one that needs extra hands on the hardest parts.

First production ramp

Prototype quantities to real volume, where allocation bites hardest.

Discuss your next build.

Tell us what you are building and when. A mutual NDA comes before your first BoM.